Application of Aluminium Mould, Climbing Frame and Assembly Integrated Construction Technology

Authors

  • Chungang Li
  • Mui Yee Cheok
  • AZRUL FAZWAN KHARUDDIN Universiti Tun Abdul Razak

Keywords:

PC assembly, Aluminium Mould Climbing Frame, Deepening Design

Abstract

In order to achieve the modularity of aluminium mould, crawler frame and PC assembly construction, and the standardization of secondary structure one-time forming, this paper takes the application of aluminium mould+crawler frame+assembly integrated construction technology in a residential project as an example, and sums up and analyzes from the process of deepening design, the key points of deepening design and the key points of construction, so as to provide guidance and reference for the deepening design and construction of the similar projects in the future.

References

[1] ZHOU Ningfei,LI Linlin. Deepening design of assembly building based on aluminium mould climbing frame integrated construction[J]. Jiangsu Construction,2021,(S2):41-44.

[2] LI Wenjun, ZHONG Qiang, ZHANG Kai. Integrated construction technology of aluminium mould climbing frame for assembled building[J]. Construction Technology,2019,48(S1):895-899.

[3]Bi Yongkui. Integrated construction technology of aluminium mould climbing frame for assembled building[J]. Smart City,2020,6(14):163-164.DOI:10.19301/j.cnki.zncs.2020.14.093.

[4] WANG Yunlei,LI Mengcai,LI Regime. Integrated construction technology of aluminium mould climbing frame for assembled buildings[J]. Construction Technology Development,2021,48(22):32-33.

[5]Zhang Wenxiong. Application of integrated construction technology of aluminium mould climbing frame in assembled building project[J]. Foshan Ceramics,2024,34(04):159-161.

[6] LIU Taiqian, LIU Chuangye, YANG Tengfei, et al. Application of integrated construction technology of aluminium mould climbing frame in assembled building project[J]. Xinjiang Nonferrous Metals,2023,46(06):109-110.DOI:10.16206/j.cnki.65-1136/tg.2023.06.047.

[7] JANG Jiangchun,GAO Yan,WANG Zhibin. Analysis of integrated construction technology of aluminium mould PC crawler for assembled building[J]. Bulk cement,2022,(06):116-118.

[8] LI Jiangyan,CHEN Wei. Research on integrated construction technology of aluminium mould climbing frame for assembled buildings[J]. Engineering Construction and Design,2022,(14):111-113.DOI:10.13616/j.cnki.gcjsysj.2022.07.236.

[9] Zhen Liang,Satellite Wen,Tao Zhang. Integrated construction technology of aluminium mould PC crawler for assembled buildings[J]. Smart City,2021,7(14):46-47.DOI:10.19301/j.cnki.zncs.2021.14.023.

[10] Jiang LL. Integrated construction technology of detachable aluminium mould climbing frame for assembled buildings[J]. China Building Metal Structure,2024,23(01):43-45.DOI:10.20080/j.cnki.ISSN1671-3362.2024.01.014.

[11] Jiang P. Analysis of construction technology for integration of aluminium mould and assembly building[J]. Residence industry,2024,(01):34-36.

[12] SONG Nan, HE Botao, YE Meng, et al. Research on integrated construction technology of aluminium mould climbing frame for assembled buildings[J]. Ceramics,2023,(09):106-108+189.DOI:10.19397/j.cnki.ceramics.2023.09.068.

[13] Chen Yanyu. Research on construction technology of aluminium mould and assembly building integration[J]. Sichuan Building Materials,2023,49(07):97-98+101.

[14] ZHANG Jiangchun, GAO Yan, WANG Zhibin. Analysis of integrated construction technology of aluminium mould PC crawler for assembled building[J]. Bulk cement,2022,(06):116-118.

[15] WANG Yuhao. Discussion on integrated construction technology of aluminium mould climbing frame for assembled buildings[J]. Engineering Technology Research,2022,7(17):57-59.DOI:10.19537/j.cnki.2096-2789.2022.17.019.

[16] Zhao G-A. Analysis of integrated construction technology of aluminium mould climbing frame for assembled buildings[J]. Brick and tile,2022,(06):148-150.DOI:10.16001/j.cnki.1001-6945.2022.06.029.

[17] SONG Hui-Peng,XIE Jing,LI Yong-Jun. Integrated construction technology of aluminium mould climbing frame for assembled buildings[J]. China Building Decoration,2022,(04):182-183.

Published

10-12-2025

How to Cite

Li, C., Cheok , M. Y., & KHARUDDIN, A. F. (2025). Application of Aluminium Mould, Climbing Frame and Assembly Integrated Construction Technology. International Journal of Management, Accounting, Governance and Education , 5(2). Retrieved from https://ojs.unirazak.edu.my/index.php/image/article/view/164

Issue

Section

Articles